The proposed development would be located on land owned by Merton College to the east of M25 Junction 9 and the A243 southbound, Leatherhead. The proposed location for the battery storage site is currently grassland.

The total site area is approximately 5 acres, however this area will be subject to environmental surveys and assessments which will be used to refine the design.

The development will include the construction of a battery storage compound within secure 2.4m high fencing. Within the fence perimeter, the battery storage containers, inverter units, load banks, transformers, DNO and customer control rooms and a customer switchroom and storage container will be installed.

Development will also require a new temporary access to be created for the construction and maintenance of the site.

Once operational, there will be minimal traffic generated by the proposals. The proposed development is temporary (40 years). The site will be restored to prior use once the proposed development has been decommissioned.

Introducing Rye BESS

Bluestone Energy is proposing to develop a Battery Energy Storage System (BESS) located on land northwest of Barnett Wood Lane, Leatherhead, KT21 2BU. This 98MW BESS facility will provide a backup supply and to stabilise the National Grid via UK Power Network’s main substation at Chessington.

 The project is in an early stage, so we would like your views on the development proposals.

 BESS allow renewable energy to be efficiently stored and supplied to the grid when it’s needed. With BESS we can use renewable energy to power our homes and businesses when the wind stops blowing and the sun isn’t shining. BESS facilities store electricity when demand is low or there is over-supply and release it back to the grid when demand is high. Moreover, they can provide ‘system security’, supplying energy during electricity outages and thus minimising disruption and costs.

The Benefits

  • It will provide flexibility through rapid charge or discharge of electricity to allow the National Grid to regulate electricity supply and demand whilst minimising greenhouse gas emissions. It will assist Mole Valley District Council to reduce greenhouse gas emissions in line with local, national, and international targets.

  • The proposed scheme would not require any government subsidies.

  • It would help National Grid to use renewable energy to power our homes and businesses when the wind stops blowing and the sun isn’t shining.

  • Introducing BESS into the energy mix allows the electricity network to “balance” generation against demand, support the UK’s urgent need for energy security.

  • The BESS would support the UK’s urgent need to transition to a low carbon future, hitting its target of cutting carbon emissions by 78% by 2035.

  • BESS maximise the use of renewable energy sources and reduce the need for expensive imported gas and polluting fossil fuel power plants.

You are invited to our public consultation event

Parish Hall, St George’s Christian Centre, Barnett Wood Ln, Ashtead, KT21 2DA

12th December 2022 (2:00pm-7:00pm)

Getting to Net Zero

Unveiled before crucial UN COP26 climate talks, which the UK hosted in Glasgow in 2021, the government has announced its target to make Britain’s electricity system “net zero carbon” by 2035, a key component of its pledge to reach net zero carbon dioxide emissions by 2050.

Put simply, Net Zero means that we will put no more greenhouse gases into the atmosphere than we take out.

Renewable Energy has the single largest role in achieving this target as low carbon technologies such as solar and wind have matured, and can replace existing coal and gas power plants. Draft Government Policy (EN-1) makes clear that as a nation we need to transform the energy system, tackling emissions while continuing to ensure secure and reliable supply, and affordable bills for households and businesses.

Energy storage systems play a vital role in delivering net zero commitments set at local and national level; the National Grid estimates that over 100GWh of energy storage will be required to meet the UK’s net zero target by 2050.

Bluestone Energy is a renewable technology developer based in the UK with a global reach. We are committed to supporting global net zero targets to help create a cleaner, greener, more sustainable world.

We originate and develop renewable energy projects across our core technology offering of solar PV, battery energy storage, on shore wind and EV infrastructure. Bluestone Energy’s expertise is in land, grid, and renewable energy technology. We have built an enviable business, leveraging key relationships with Governments, Airports, Water Utilities, NHS, and Local Authorities.

This project forms part of a joint development agreement with Macquarie Asset Management’s Green Investment Group to develop in excess of 2 GW of battery energy storage capacity throughout the UK.

Contact us.

Please provide your contact details if you wish to get a response.

Any information provided will only be used for the purpose of the planning application to the Local Planning Authority and will not be disclosed with any third parties.